Home / Tools / Site access checklistProject: Walked with: Date/version:
Route dimensions Narrowest gate or side-yard width Vertical clearance and overhead lines Turns, slopes, steps, and grade changes Street, driveway, or neighboring access constraintsThings to locate Marked utilities and private services Septic, drainage, irrigation, and easements Trees, roots, walls, fences, sheds, and roof overhangs Existing pool equipment, electrical service, and gasProtection and temporary work Surfaces, landscaping, structures, and neighboring property to protect Items requiring temporary removal and secure reinstatement Dust, mud, runoff, noise, and daily site security Material storage, excavation haul-out, and worker accessUnknown conditions Soil, rock, groundwater, fill, or buried construction Who investigates before work begins How a discovery is documented and priced Who can pause work and approve a changed approachRestoration and closeout Driveway, paving, fence, gate, and landscape repair standard Drainage after final grading Debris removal and cleaning Photographs and written acceptance of restored areas
Do not rely on a visual guess. Ask who verified the construction route, what equipment the route must accommodate, and which repair obligations are included in the proposal.Read the site-access planning guide →